Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2021, 07:54 AM
  • 05 2330_05 1472_06172021_010342.mp4

Date
06/17/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06696
Time
12:54 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8986
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 2330
Downstream MH
05 1472
Dir. of Survey
Downstream
Length Surveyed
258 ft.
Total Length
258 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
357
Pipe schematic from manhole 05 2330 to 05 1472
MH: 05 2330MH: 05 1472downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 23300 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"97.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN182.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN225.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN256 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish258 ft. AMH - Downstream Manhole, Survey Ends - 05 1472258 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0MGOROACHES @ MH
2.1SAV
258AMH05 1472
5.2TFA
258SAV
2.1SSS
258SSS
225.5TFOPEN
0MWL
0MWM
258MGOCONN @ MH 3 O'CLOCK/CAPPED
2DAGS
0AMH05 2330
97.2TFOPEN
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
182.5TFOPEN
256DAGS

Properties (7)

additional_info
630074061621201
custom_field_three
AGGREGATE VISIBLE/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2021-06-17T00:54:22-07:00
documentation
PROPIPE
is_lateral_inspection
false