Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2021, 08:48 AM
  • 05 1469A_05 1469_06172021_015500.mp4

Date
06/17/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06692
Time
1:48 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8986
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
05 1469A
Downstream MH
05 1469
Dir. of Survey
Downstream
Length Surveyed
145 ft.
Total Length
145 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
140
O&M Index
2
O&M Quick
2E00
O&M Rating
56
Overall Index
2
Overall Quick
Overall Rating
196
Pipe schematic from manhole 05 1469A to 05 1469
MH: 05 1469AMH: 05 1469downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 05 1469A0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.1 ft. MGO - General Observation - 45% MAG COAT3.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"64.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"116 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN143 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish144.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish144.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish144.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED145 ft. AMH - Downstream Manhole, Survey Ends - 05 1469

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
143DAGS
3.1MGO45% MAG COAT
144.9SAV
145AMH05 1469
3.1SAV
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMH05 1469A
116TFOPEN
2DAGS
144.9SSS
0MWM
144.9MGOCONN @ MH 3 O'CLOCK/CAPPED
64.6TFC
16.3TFC
0MGOROACHES @ MH
0MWL
6.5SSS

Properties (7)

additional_info
630074061621201
custom_field_three
AGGREGATE VISIBLE/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2021-06-17T01:48:02-07:00
documentation
PROPIPE
is_lateral_inspection
false