Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2021, 06:07 AM
  • 05 1469_05 1468_06162021_232810.mp4

Date
06/16/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06691
Time
11:07 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8986
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 1469
Downstream MH
05 1468
Dir. of Survey
Downstream
Length Surveyed
325 ft.
Total Length
325 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
453
Pipe schematic from manhole 05 1469 to 05 1468
MH: 05 1469MH: 05 1468downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14692 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"63 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN115.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"163.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"166.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"215.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"262.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"314.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"323 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish324.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED325 ft. AMH - Downstream Manhole, Survey Ends - 05 1468

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
215.1TFC
0MWM
115.3TFC
63TFUNKNOWN
9.1TFC
262.9TFC
325MGOCONN @ MH 3 O'CLOCK/CAPPED
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
2MGO65% MAG COAT
324.9SAV
323DAGS
166.8TFC
0MWL
324.9SSS
0AMH05 1469
314.1TFC
325AMH05 1468
2.1SAV
2DAGS
2.1SSS
163.5TFC

Properties (7)

additional_info
630074061621201
custom_field_three
AGGREGATE VISIBLE/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2021-06-16T23:07:20-07:00
documentation
PROPIPE
is_lateral_inspection
false