Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2021, 07:07 AM
  • 05 1466_05 1465_06172021_001747.mp4

Date
06/17/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06688
Time
12:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8986
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 1466
Downstream MH
05 1465
Dir. of Survey
Downstream
Length Surveyed
321.2 ft.
Total Length
321.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
431
Pipe schematic from manhole 05 1466 to 05 1465
MH: 05 1466MH: 05 1465downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - 65% MAG COAT0 ft. AMH - Upstream Manhole, Survey Begins - 05 14660 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start16.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"61.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"319 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish321.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1465321.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE321.2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED321.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    16.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    16.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
272.6TFC
0MWL
321.2AMH05 1465
321.2SAV
321.2MGOCONN @ MH 3 O'CLOCK/ACTIVE
16.4SAV
161.2TFC
2DAGS
321.2MGOCONN @ MH 9 O'CLOCK/CAPPED
122.1TFC
221.5TFC
22.1TFC
170.2TFC
0MWM
0MGO65% MAG COAT
16.4SSS
319DAGS
321.2SSS
0AMH05 1466
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
61.7TFC

Properties (7)

additional_info
630074061621201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
2
customer
1
datetime
2021-06-17T00:07:16-07:00
documentation
PROPIPE
is_lateral_inspection
false