Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2021, 10:12 AM
  • 01 0261_01 0260_06142021_033833.mp4

Date
06/14/2021
W/O
896354
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01307
Time
3:12 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8897
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_896354_TV01204_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
01 0260
Downstream MH
01 0261
Dir. of Survey
Upstream
Length Surveyed
320.4 ft.
Total Length
320.4 ft.
Structural Index
3
Structural Quick
4L3L
Structural Rating
571
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
3
Overall Quick
Overall Rating
697
Pipe schematic from manhole 01 0260 to 01 0261
MH: 01 0260MH: 01 0261upstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 01 02602.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish61.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"101 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"139.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN181.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN220.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"259 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"318.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start318.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start318.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start318.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start320.4 ft. AMH - Downstream Manhole, Survey Begins - 01 0260320.4 ft. MWM - Water Mark, 35 %of cross sectional area320.4 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE320.4 ft. MWL - Water Level, 30 %of cross sectional area

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
320.4MGOCONN @ MH 3 O'CLOCK/ACTIVE
258.7TFA
2CM
318CM
99.9TFA
320.4MGOROACHES @ MH
139TFOPEN
318SSS
2SSS
180.8TFOPEN
61.4TFC
318DAGS
0AMH01 0260
2.1FM
0MWM
320.4MGOCONN @ MH 9 O'CLOCK/ACTIVE
2DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWL
219.4TFC
320.4FM
320.4AMH01 0260

Properties (7)

additional_info
630074061421001
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-06-14T03:12:34-07:00
documentation
PROPIPE
is_lateral_inspection
false