Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2021, 11:07 AM
  • 01 0258_01 0257_06142021_041720.mp4

Date
06/14/2021
W/O
896354
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01304
Time
4:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8897
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_896354_TV01204_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
21 in.
Upstream MH
01 0258
Downstream MH
01 0257
Dir. of Survey
Downstream
Length Surveyed
284 ft.
Total Length
284 ft.
Structural Index
3
Structural Quick
4J3J
Structural Rating
504
O&M Index
2
O&M Quick
412J
O&M Rating
118
Overall Index
3
Overall Quick
Overall Rating
622
Pipe schematic from manhole 01 0258 to 01 0257
MH: 01 0258MH: 01 0257downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 01 02580 ft. MGO - General Observation - ROACHES @ MH2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start105.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN147.3 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - BROKEN CONN/OPEN184.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"224.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"266.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN281 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish281 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish281 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish284 ft. AMH - Downstream Manhole, Survey Ends - 01 0257284 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish284 ft. MGO - General Observation - ROACHES @ MH

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
224.8TFC
281SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2DAGS
281DAGS
0MWM
284AMH01 0257
2CM
284FM
147.3TFDBROKEN CONN/OPEN
0MWL
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
184.7TFA
105.6TFOPEN
0AMH01 0258
281CM
284MGOROACHES @ MH
266.8TFOPEN
3.5FM
0MGOROACHES @ MH
2SSS

Properties (7)

additional_info
630074061421001
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-06-14T04:07:06-07:00
documentation
PROPIPE
is_lateral_inspection
false