Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2021, 08:04 AM
  • 01 0250_01 0249_06152021_011716.mp4

Date
06/15/2021
W/O
896354
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01295
Time
1:04 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8899
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_896354_TV01204_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
10 in.
Upstream MH
01 0250
Downstream MH
01 0249
Dir. of Survey
Downstream
Length Surveyed
348.3 ft.
Total Length
348.3 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
345
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
483
Pipe schematic from manhole 01 0250 to 01 0249
MH: 01 0250MH: 01 0249downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02500 ft. MWM - Water Mark, 15 %of cross sectional area0.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0.1 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start67.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"93.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN120.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"144.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"171.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"194.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"244.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN268.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"295.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"322.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"345.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"346 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish346 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish348.3 ft. AMH - Downstream Manhole, Survey Ends - 01 0249348.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED348.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
171.4TFC
221.4TFC
346DAGS
268.6TFC
348.3AMH01 0249
2SSS
295.3TFC
0MWL
0AMH01 0250
2DAGS
0.1MGOCONN @ MH 9 O'CLOCK/ACTIVE
93.8TFOPEN
144.7TFC
67.9TFC
0MWM
346SSS
348.3MGOCONN @ MH 3 O'CLOCK/CAPPED
120.8TFC
348.3CM
194.9TFC
0.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
322.2TFC
5CM
345.8TFC
244.9TFOPEN

Properties (7)

additional_info
630074061421202
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-15T01:04:33-07:00
documentation
PROPIPE
is_lateral_inspection
false