Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2021, 10:03 AM
  • 01 1404_01 0236_06152021_030956.mp4

Date
06/15/2021
W/O
896354
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01282
Time
3:03 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8899
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_896354_TV01204_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
12 in.
Upstream MH
01 1404
Downstream MH
01 0236
Dir. of Survey
Downstream
Length Surveyed
139.1 ft.
Total Length
139.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3D2D
O&M Rating
123
Overall Index
2
Overall Quick
Overall Rating
123
Pipe schematic from manhole 01 1404 to 01 0236
MH: 01 1404MH: 01 0236downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - 01 14040 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - PIPE IS LINED11.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN23 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - DEBRIS76.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN121.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN137 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish139 ft. MGO - General Observation - ROACHES @ MH139.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish139.1 ft. AMH - Downstream Manhole, Survey Ends - 01 0236

Observation photos (1)

  • Deposits Settled Other,  15 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    23 ft. - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (15)

DistanceCodeObservation
0MWM
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
2.1MGOPIPE IS LINED
23DSZDEBRIS
121.9TFOPEN
139.1DSZ
139MGOROACHES @ MH
0AMH01 1404
76.8TFOPEN
11.2TFOPEN
139.1AMH01 0236
2DAGS
0MWL
137DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE

Properties (7)

additional_info
630074061421202
custom_field_three
RFIR NO SEVRE DEFECTS/ PIPE IS LINED
custom_field_two
4
customer
1
datetime
2021-06-15T03:03:00-07:00
documentation
PROPIPE
is_lateral_inspection
false