Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2021, 09:27 AM
  • 02 0964_02 2377_06162021_023434.mp4

Date
06/16/2021
W/O
896122
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00279
PipeID
P03534
Time
2:27 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8940
Sewer Name
02 MONTEBELLO TRUNK
City
COMMERCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_896122_TV02320_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
33 in.
Upstream MH
02 0964
Downstream MH
02 2377
Dir. of Survey
Downstream
Length Surveyed
115.7 ft.
Total Length
115.7 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
110
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
110
Pipe schematic from manhole 02 0964 to 02 2377
MH: 02 0964MH: 02 2377downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 09640.1 ft. MGO - General Observation - ROACHES @ MH2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT114.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish114.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish115.7 ft. MGO - General Observation - ROACHES @ MH115.7 ft. AMH - Downstream Manhole, Survey Ends - 02 2377

Observation photos (4)

  • General Observation - ROACHES @ MH

    0.1 ft. - General Observation - ROACHES @ MH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    115.7 ft. - General Observation - ROACHES @ MH

Observations (11)

DistanceCodeObservation
114.2SAP
115.7MGOROACHES @ MH
0.1MGOROACHES @ MH
2SAP
114.2SSS
2SSS
0MWL
0MWM
115.7AMH02 2377
0AMH02 0964
2MGO35% MAG COAT

Properties (7)

additional_info
630069061521202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-06-16T02:27:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false