Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 2, 2021, 07:30 AM
  • 02 0961_02 1400_06022021_004034.mp4

Date
06/02/2021
W/O
896122
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00279
PipeID
P03531
Time
12:30 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8934
Sewer Name
02 MONTEBELLO TRUNK
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896122_TV02320_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
33 in.
Upstream MH
02 0961
Downstream MH
02 1400
Dir. of Survey
Downstream
Length Surveyed
255.8 ft.
Total Length
255.8 ft.
Structural Index
3
Structural Quick
3I2B
Structural Rating
185
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
287
Pipe schematic from manhole 02 0961 to 02 1400
MH: 02 0961MH: 02 1400downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 09610 ft. MGO - General Observation - ROACHES @ MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start255.8 ft. MGO - General Observation - ROACHES @ MH255.8 ft. AMH - Downstream Manhole, Survey Ends - 02 1400255.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish255.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish255.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish255.8 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/STOP LOG DOWN

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 65% MAG COAT

    2 ft. - General Observation - 65% MAG COAT

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    255.8 ft. - General Observation - ROACHES @ MH

Observations (14)

DistanceCodeObservation
2SSS
0MWM
255.8MGOROACHES @ MH
0MWL
0AMH02 0961
2MGO65% MAG COAT
255.8AMH02 1400
2DAGS
255.8DAGS
2SAP
255.8SAP
0MGOROACHES @ MH
255.8SSS
255.8MGOCONN @ MH 3 O'CLOCK/STOP LOG DOWN

Properties (7)

additional_info
630069060121203
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
3
customer
1
datetime
2021-06-02T00:30:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false