Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 2, 2021, 10:32 AM
  • 02 1400_02 0960_06022021_033736.mp4

Date
06/02/2021
W/O
896122
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00279
PipeID
P03530
Time
3:32 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8934
Sewer Name
02 MONTEBELLO TRUNK
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896122_TV02320_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
33 in.
Upstream MH
02 0960
Downstream MH
02 1400
Dir. of Survey
Upstream
Length Surveyed
86.5 ft.
Total Length
86.5 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
80
O&M Index
2
O&M Quick
2B00
O&M Rating
34
Overall Index
2
Overall Quick
Overall Rating
114
Pipe schematic from manhole 02 0960 to 02 1400
MH: 02 0960MH: 02 1400upstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Ends - 02 14000 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE82.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start82.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start84.5 ft. MGO - General Observation - 30% MAG COAT84.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS86.5 ft. AMH - Downstream Manhole, Survey Begins - 02 096086.5 ft. MWL - Water Level, 10 %of cross sectional area86.5 ft. MWM - Water Mark, 15 %of cross sectional area

Observation photos (4)

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    86.5 ft. - General Observation - ROACHES @ MH

Observations (13)

DistanceCodeObservation
86.5SSS
0AMH02 0960
86.5DSZ
2MGO30% MAG COAT
86.5SAP
4.3SSS
4.3SAP
86.5MGOROACHES @ MH
2DSZDEBRIS
86.5AMH02 1400
0MWL
86.5MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWM

Properties (7)

additional_info
630069060121203
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
3
customer
1
datetime
2021-06-02T03:32:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false