Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2021, 05:05 AM
  • 02 0956_02 0955_06142021_230648.mp4

Date
06/14/2021
W/O
896122
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00279
PipeID
P03525
Time
10:05 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8938
Sewer Name
02 MONTEBELLO TRUNK
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896122_TV02320_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
15 in.
Upstream MH
02 0956
Downstream MH
02 0955
Dir. of Survey
Downstream
Length Surveyed
329.5 ft.
Total Length
329.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
328
O&M Index
2
O&M Quick
322L
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
466
Pipe schematic from manhole 02 0956 to 02 0955
MH: 02 0956MH: 02 0955downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 09560 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 15% MAG COAT74.5 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, at 04 o'clock, , within 8 inches of joint: YES143.8 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES327 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish328.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS329.5 ft. AMH - Downstream Manhole, Survey Ends - 02 0955329.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 15% MAG COAT

    2 ft. - General Observation - 15% MAG COAT

  • Deposits Settled Compacted,  10 %of cross sectional area, at 04 o'clock,  , within 8 inches of joint: YES

    74.5 ft. - Deposits Settled Compacted, 10 %of cross sectional area, at 04 o'clock, , within 8 inches of joint: YES

  • Deposits Settled Compacted,  15 %of cross sectional area, from 07 to 09 o'clock,  , within 8 inches of joint: YES

    143.8 ft. - Deposits Settled Compacted, 15 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIS

    328.9 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS

Observations (14)

DistanceCodeObservation
2SAV
0AMH02 0956
0MWL
143.8DSC
327SSS
2DAGS
328.9DSZDEBRIS
2SSS
329.5AMH02 0955
74.5DSC
0MWM
329.5SAV
327DAGS
2MGO15% MAG COAT

Properties (7)

additional_info
630069061421201
custom_field_three
VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2021-06-14T22:05:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false