Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2021, 10:40 AM
  • 02 0939_02 0938_06152021_035356.mp4

Date
06/15/2021
W/O
896122
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00279
PipeID
P03509
Time
3:40 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8938
Sewer Name
02 MONTEBELLO TRUNK
City
BELL GARDENS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896122_TV02320_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
24 in.
Upstream MH
02 0939
Downstream MH
02 0938
Dir. of Survey
Downstream
Length Surveyed
394 ft.
Total Length
394 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
2
O&M Quick
2H00
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
484
Pipe schematic from manhole 02 0939 to 02 0938
MH: 02 0939MH: 02 0938downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 02 09380 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start168.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS216 ft. MWM - Water Mark, 25 %of cross sectional area391 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish391 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish391.7 ft. MGO - General Observation - ROACHES @ MH391.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish391.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish394 ft. AMH - Downstream Manhole, Survey Ends - 02 0938394 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (4)

  • General Observation - 70% MAG COAT

    2 ft. - General Observation - 70% MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    168.5 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • General Observation - ROACHES @ MH

    391.7 ft. - General Observation - ROACHES @ MH

Observations (18)

DistanceCodeObservation
2SSS
394AMH02 0938
0MWM
0MWL
391.7MGOROACHES @ MH
391SSS
168.5DSZDEBRIS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
391DAGS
394MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMH02 0938
391.7SAV
2MGO70% MAG COAT
2DAGS
391.7DSZ
2SAV
216MWM
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN

Properties (7)

additional_info
630069061421201
custom_field_three
VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2021-06-15T03:40:44-07:00
documentation
PRO PIPE
is_lateral_inspection
false