Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2021, 08:52 AM
  • 18 0709_18 0708_05282021_015830.mp4

Date
05/28/2021
W/O
890827
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00706
PipeID
P14559
Time
1:52 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8930
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_890827_TV18104_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
18 0709
Downstream MH
18 0708
Dir. of Survey
Downstream
Length Surveyed
132.3 ft.
Total Length
132.3 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
125
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
187
Pipe schematic from manhole 18 0709 to 18 0708
MH: 18 0709MH: 18 0708downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07090 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start99.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS129.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish129.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish129.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish129.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish132.3 ft. AMH - Downstream Manhole, Survey Ends - 18 0708

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2SAV
129.1SAV
129.1DAGS
129.1DSZ
2MGOMAG COATING THROUGHOUT
0MWM
0AMH18 0709
2DAGS
0MWL
129.1SSS
132.3AMH18 0708
2SSS
99.8DSZDEBRIS

Properties (7)

additional_info
630069052721202
custom_field_three
VISIBLE AGGREGATE/SPALLING
custom_field_two
3
customer
1
datetime
2021-05-28T01:52:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false