Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2021, 08:59 AM
  • 18 0708_18 0707_05282021_021829.mp4

Date
05/28/2021
W/O
890827
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00706
PipeID
P14558
Time
1:59 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8930
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_890827_TV18104_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
18 0708
Downstream MH
18 0707
Dir. of Survey
Downstream
Length Surveyed
539.8 ft.
Total Length
539.8 ft.
Structural Index
3
Structural Quick
3T2T
Structural Rating
535
O&M Index
2
O&M Quick
2g00
O&M Rating
404
Overall Index
2
Overall Quick
Overall Rating
939
Pipe schematic from manhole 18 0708 to 18 0707
MH: 18 0708MH: 18 0707downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07080 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT60.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS537.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish537.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish537.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish537.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish537.2 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK539.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0707

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

Observations (14)

DistanceCodeObservation
2DAGS
537.2DAGS
2SSS
0MWL
539.8AMH18 0707
537.2DSZ
537.2SAV
2SAV
0AMH18 0708
537.2SSS
60.1DSZDEBRIS
2MGOMAG COATING THROUGHOUT
537.2MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
0MWM

Properties (7)

additional_info
630069052721202
custom_field_three
VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2021-05-28T01:59:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false