Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 09:45 AM
  • 18 0270_18 0269_06232021_025320.mp4

Date
06/23/2021
W/O
896153
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00672
PipeID
P14098
Time
2:45 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9053
Sewer Name
18 BROADWAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
09
Purpose
Routine Assessment
Project
WO_896153_TV18003_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0269
Downstream MH
18 0270
Dir. of Survey
Upstream
Length Surveyed
119.1 ft.
Total Length
119.1 ft.
Structural Index
2
Structural Quick
3C2D
Structural Rating
110
O&M Index
2
O&M Quick
2D00
O&M Rating
46
Overall Index
2
Overall Quick
Overall Rating
156
Pipe schematic from manhole 18 0269 to 18 0270
MH: 18 0269MH: 18 0270upstream0 ft. AMH - Upstream Manhole, Survey Ends - 18 02700 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish99.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES117.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start117.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start117.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start119.1 ft. AMH - Downstream Manhole, Survey Begins - 18 0269119.1 ft. MWL - Water Level, 20 %of cross sectional area119.1 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    19.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (12)

DistanceCodeObservation
0AMH18 0269
119.1AMH18 0270
117SSS
2SSS
117DAGS
119.1CM
2CM
0MWL
119.1MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWM
2DAGS
19.6CM

Properties (7)

additional_info
630074062221203
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-23T02:45:23-07:00
documentation
PROPIPE
is_lateral_inspection
false