Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2018, 05:19 PM
  • 30 0018_30 0017_6252018_103741.mp4

Date
06/25/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17719
Time
10:19 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7738
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0018
Downstream MH
30 0017
Dir. of Survey
Downstream
Length Surveyed
337.6 ft.
Total Length
337.6 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0018 to 30 0017
MH: 30 0018MH: 30 0017downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 10:21 AM0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start50.7 ft. MGP - General Photograph126.3 ft. MGP - General Photograph250.6 ft. MGP - General Photograph333.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.6 ft. MGP - General Photograph333.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.6 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG337.6 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)337.6 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach337.6 ft. AMH - Downstream Manhole, Survey Ends - 10:50 AM

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    50.7 ft. - General Photograph

  • General Photograph

    126.3 ft. - General Photograph

  • General Photograph

    250.6 ft. - General Photograph

  • General Photograph

    333.6 ft. - General Photograph

Observations (19)

DistanceCodeObservation
2SSS
0MGOConn. @ Mh, 3 O' Clock. Active
333.6SAP
337.6MGOGREASE THROUGHOUT THE REACH (5%)
337.6MGOPeeling & Flaking Throughout The Reach
126.3MGP
337.6AMH10:50 AM
2SRV
0AMH10:21 AM
2SZ70% MAG
333.6SRV
333.6MGP
2SAP
333.6SSS
250.6MGP
50.7MGP
0MWL
0MWM
333.6SZ70% MAG

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-25T10:19:22-07:00
documentation
FRANKLIN, IGNACIO, VENDRYES, PARAISO
is_lateral_inspection
false