Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2021, 10:17 AM
  • 02 0010_02 0009_06012021_033015.mp4

Date
06/01/2021
W/O
896218
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00234
PipeID
P03036
Time
3:17 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8931
Sewer Name
02 ARTESIA EXTENSION TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_896218_TV02341_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
15 in.
Upstream MH
02 0009
Downstream MH
02 0010
Dir. of Survey
Upstream
Length Surveyed
391.9 ft.
Total Length
391.9 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
382
O&M Index
2
O&M Quick
412N
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
540
Pipe schematic from manhole 02 0009 to 02 0010
MH: 02 0009MH: 02 0010upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 00100 ft. MGO - General Observation - ROACHES @ MH2.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish25.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"82.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"150.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"211.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"274.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"326.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"381.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start389.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start389.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start391.9 ft. AMH - Downstream Manhole, Survey Begins - 02 0009391.9 ft. MWM - Water Mark, 30 %of cross sectional area391.9 ft. MGO - General Observation - ROACHES @ MH391.9 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.6 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    391.9 ft. - General Observation - ROACHES @ MH

Observations (18)

DistanceCodeObservation
180.7TFA
2SSS
389.3CM
309TFA
65TFC
0AMH02 0009
241.2TFA
391.9AMH02 0010
0MWM
389.3DAGS
391.9MGOROACHES @ MH
2DAGS
10.6CM
389SSS
0MGOROACHES @ MH
117.6TFA
0MWL
366.6TFA

Properties (7)

additional_info
630069060121001
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-01T03:17:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false