Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 07:34 AM
  • 15 0665_15 0664_06232021_005253.mp4

Date
06/23/2021
W/O
896249
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12557
Time
12:34 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8991
Sewer Name
15 EL MONTE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_896249_TV15005_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0665
Downstream MH
15 0664
Dir. of Survey
Downstream
Length Surveyed
300.4 ft.
Total Length
300.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
307
O&M Index
2
O&M Quick
2J00
O&M Rating
106
Overall Index
2
Overall Quick
Overall Rating
413
Pipe schematic from manhole 15 0665 to 15 0664
MH: 15 0665MH: 15 0664downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 06650 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"35.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"71 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"116.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"150.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"155.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6", 6"169.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES188.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"236.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"261.4 ft. MWLS - Water Level, Sag in pipe, 25 %of cross sectional area, Start266.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"266.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish267.8 ft. RPP - Repair Patch, from 12 to 12 o'clock, within 8 inches of joint: YES - .269.1 ft. MWLS - Water Level, Sag in pipe, 25 %of cross sectional area, Finish299.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK299.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0664

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    150.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    169.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 25 %of cross sectional area, Start

    261.4 ft. - Water Level, Sag in pipe, 25 %of cross sectional area, Start

  • Repair Patch, from 12 to 12 o'clock, within 8 inches of joint: YES - .

    267.8 ft. - Repair Patch, from 12 to 12 o'clock, within 8 inches of joint: YES - .

Observations (24)

DistanceCodeObservation
266.6TFC
0AMH15 0665
299.9SSS
150.2TB
300.4AMH15 0664
267.8RPP.
299.9MGOCONNECTION AT MH 3 O'CLOCK
2DAGS
2.1SSS
12.7TF
116.4TFC
2.1SAV
0MWL
169.8CM
35.2TFC
261.4MWLS
155.8TFA
188.8TFC
236.8TFC
299.9SAV
0MWM
269.1MWLS
266.6DAGS
71TF

Properties (6)

custom_field_three
CRACKS, AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2021-06-23T00:34:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false