Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 08:35 AM
  • 15 0662_15 0661_06232021_015346.mp4

Date
06/23/2021
W/O
896249
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12554
Time
1:35 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8991
Sewer Name
15 EL MONTE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_896249_TV15005_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0662
Downstream MH
15 0661
Dir. of Survey
Downstream
Length Surveyed
457.9 ft.
Total Length
457.9 ft.
Structural Index
3
Structural Quick
3R2Q
Structural Rating
457
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
457
Pipe schematic from manhole 15 0662 to 15 0661
MH: 15 0662MH: 15 0661downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 06620 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWL - Water Level, 20 %of cross sectional area2.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES116.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"225.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"363.3 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6"384.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"404.3 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES455.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish455.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish457.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0661457.9 ft. MGO - General Observation - ROACHES IN MH457.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED

Observation photos (5)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    36.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6"

    363.3 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6"

  • Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    404.3 ft. - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
404.3FL
0AMH15 0662
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
36.7CM
116.7TFA
11SSS
363.3TB
384.9TFC
2.2SAV
457.9AMH15 0661
225.3TF
455.9SAV
0MGOCONNECTION AT MH 3 O'CLOCK
455.9SSS
457.9MGOROACHES IN MH
457.9MGOCONNECTION AT MH 3 O'CLOCK CAPPED
0MGOROACHES IN MH
0MWL

Properties (6)

custom_field_three
CRACKS, AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2021-06-23T01:35:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false