Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 08:21 AM
  • 02 1034_02 1033_06232021_014806.mp4

Date
06/23/2021
W/O
896250
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00280
PipeID
P03608
Time
1:21 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9002
Sewer Name
02 MONTEBELLO CITY TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
WO_896250_TV02295_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
02 1034
Downstream MH
02 1033
Dir. of Survey
Downstream
Length Surveyed
330 ft.
Total Length
330 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
311
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
441
Pipe schematic from manhole 02 1034 to 02 1033
MH: 02 1034MH: 02 1033downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 02 10340 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start36 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"47.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"121.9 ft. MGO - General Observation - MAG COATING THROUGHOUT121.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"128 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"159.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"171.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"241.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"262.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"265.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"297.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"309.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"327.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish330 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK330 ft. AMH - Downstream Manhole, Survey Ends - 02 1033330 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    36 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    121.9 ft. - General Observation - MAG COATING THROUGHOUT

  • General Observation - COCKROACHES IN MANHOLE

    330 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (35)

DistanceCodeObservation
44.2TFC
0MGOCOCKROACHES IN MANHOLE
91.3TFC
214.3TFC
327.7SAP
327.7SSS
241.7TFC
0AMH02 1034
193.2TFC
265.8TFC
309.2TFC
2SAP
121.9MGOMAG COATING THROUGHOUT
0MWL
109.7TFC
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
159.5TFC
2DAGS
128TFC
0MWM
330MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
121.9TFC
148.5TFC
330AMH02 1033
70.8TFC
327.7DAGS
171.9TFC
189.9TFC
297.3TFC
330MGOCOCKROACHES IN MANHOLE
47.9TFC
226.6TFC
36SSS
88.8TFC
262.7TFC

Properties (7)

additional_info
630069062221202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-06-23T01:21:49-07:00
documentation
PRO PIPE
is_lateral_inspection
false