Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 08:48 AM
  • 02 1033_02 1032_06232021_020229.mp4

Date
06/23/2021
W/O
896250
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00280
PipeID
P03607
Time
1:48 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9002
Sewer Name
02 MONTEBELLO CITY TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
WO_896250_TV02295_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
02 1033
Downstream MH
02 1032
Dir. of Survey
Downstream
Length Surveyed
331.1 ft.
Total Length
331.1 ft.
Structural Index
3
Structural Quick
513L
Structural Rating
322
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
452
Pipe schematic from manhole 02 1033 to 02 1032
MH: 02 1033MH: 02 1032downstream0 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10330 ft. MGO - General Observation - COCKROACHES IN MANHOLE3.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.7 ft. MGO - General Observation - MAG COATING THROUGHOUT24.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start54.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"80 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"103.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"181.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"184.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"219.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"251.3 ft. H - Hole, from 09 to 04 o'clock, within 8 inches of joint: YES269 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"302.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"326.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"329.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish329.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish331.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK331.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE331.1 ft. AMH - Downstream Manhole, Survey Ends - 02 1032

Observation photos (7)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    3.7 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    24.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Hole, from 09 to 04 o'clock, within 8 inches of joint: YES

    251.3 ft. - Hole, from 09 to 04 o'clock, within 8 inches of joint: YES

  • General Observation - COCKROACHES IN MANHOLE

    331.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (28)

DistanceCodeObservation
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
3.7DAGS
329.1SSS
181.4TFC
329.1SAP
269TFC
329.1DAGS
331.1MGOCONNECTION AT MH 9 O'CLOCK
122.3TFC
302.8TFC
219.7TFC
0MWM
103.6TFC
331.1MGOCOCKROACHES IN MANHOLE
251.3H
0MWL
124.5TFC
184.4TFC
3.7SAP
83.1TFC
0AMH02 1033
80TFC
326.2TFC
24.9SSS
0MGOCOCKROACHES IN MANHOLE
54.5TFC
331.1AMH02 1032
3.7MGOMAG COATING THROUGHOUT

Properties (7)

additional_info
630069062221202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-06-23T01:48:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false