Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2021, 07:13 AM
  • B 0452_B 0451_06182021_002331.mp4

Date
06/18/2021
W/O
896150
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08964
Time
12:13 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8942
Sewer Name
B JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_896150_TV16079_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
57 in.
Upstream MH
B 0452
Downstream MH
B 0451
Dir. of Survey
Downstream
Length Surveyed
228 ft.
Total Length
228 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
135
O&M Index
2
O&M Quick
412H
O&M Rating
94
Overall Index
3
Overall Quick
Overall Rating
229
Pipe schematic from manhole B 0452 to B 0451
MH: B 0452MH: B 0451downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 04520 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start50.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"105.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"181.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"184.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"191.8 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"226 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish226 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish228 ft. AMH - Downstream Manhole, Survey Ends - B 0451228 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
228AMHB 0451
105.5TFA
0AMHB 0452
2SAP
226DAGS
181.5TFC
228MGOCONNECTION AT MH 3 O'CLOCK
51.3TFC
50.2TFA
2MGOMAG COATING THROUGHOUT
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
226SAP
184.5TFC
109.4TFC
0MWL
2DAGS
191.8TBA

Properties (7)

additional_info
630069061721201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-06-18T00:13:45-07:00
documentation
PRO PIPE