Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2021, 09:33 AM
  • H 0690_H 0689_05252021_024324.mp4

Date
05/25/2021
W/O
891214
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P11097
Time
2:33 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8968
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_891214_TV18175_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0690
Downstream MH
H 0689
Dir. of Survey
Downstream
Length Surveyed
323.7 ft.
Total Length
323.7 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
320
Pipe schematic from manhole H 0690 to H 0689
MH: H 0690MH: H 0689downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06900 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.6 ft. MGO - General Observation - MAG COAT2.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start323.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323.7 ft. AMH - Downstream Manhole, Survey Ends - H 0689

Observation photos (3)

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
2.6MGOMAG COAT
2.7SAV
0AMHH 0690
323.7SSS
0MWM
2.7SSS
323.7SAV
0MWL
323.7AMHH 0689

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2021-05-25T02:33:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false