Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 2, 2021, 04:32 PM
  • H 0687_H 0686_06022021_094507.mp4

Date
06/02/2021
W/O
891214
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P11094
Time
9:32 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8976
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_891214_TV18175_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0686
Downstream MH
H 0687
Dir. of Survey
Upstream
Length Surveyed
77.2 ft.
Total Length
77.2 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
75
O&M Index
3
O&M Quick
492B
O&M Rating
66
Overall Index
3
Overall Quick
Overall Rating
141
Pipe schematic from manhole H 0686 to H 0687
MH: H 0686MH: H 0687upstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - H 06870 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish30.2 ft. LR - Alignment Right, 25 %, Finish70.1 ft. LR - Alignment Right, 25 %, Start75.2 ft. MGO - General Observation - 65% MAG COAT75.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start77.2 ft. AMH - Downstream Manhole, Survey Begins - H 068677.2 ft. MWM - Water Mark, 30 %of cross sectional area77.2 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (4)

  • General Observation - 65% MAG COAT

    2 ft. - General Observation - 65% MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Right, 25 %, Start

    7.1 ft. - Alignment Right, 25 %, Start

Observations (13)

DistanceCodeObservation
0AMHH 0686
2MGO65% MAG COAT
2SAV
75DAGS
7.1LR
2SSS
2DAGS
77.2SSS
0MWM
47LR
0MWL
77.2AMHH 0687
77.2SAV

Properties (6)

custom_field_three
AGGREGATE VISIBLE.SPALLING
custom_field_two
3
customer
1
datetime
2021-06-02T09:32:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false