H 0678_H 0677_06032021_074950.mp4
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
206.2 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN
208.5 ft. - Deposits Settled Compacted, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start
208.5 ft. - Water Level, Sag in pipe, 25 %of cross sectional area, Start
216 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 208.5 | DSC | — |
| 206.2 | TB | OPEN |
| 0 | AMH | H 0677 |
| 0 | MWL | — |
| 208.5 | MWLS | — |
| 0 | MWM | — |
| 196 | SAP | — |
| 2 | DAGS | — |
| 2 | SAV | — |
| 214 | DAGS | — |
| 199 | SAP | — |
| 216 | MWLS | — |
| 216 | SSS | — |
| 2 | MGO | 40% MAG COAT |
| 216 | MSA | DEBRIS/SAG |
| 199.8 | TFC | — |
| 2 | SSS | — |
| 216 | SAV | — |
| 216 | DSC | — |