Wastewater/Activity/PacpInspection/1.0Jun 3, 2021, 02:39 PM
  • H 0678_H 0677_06032021_074950.mp4

Date
06/03/2021
W/O
891214
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P11085
Time
7:39 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8978
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_891214_TV18175_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0677
Downstream MH
H 0678
Dir. of Survey
Upstream
Length Surveyed
216 ft.
Total Length
216 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
2
O&M Quick
322G
O&M Rating
90
Overall Index
2
Overall Quick
Overall Rating
315
Pipe schematic from manhole H 0677 to H 0678
MH: H 0677MH: H 0678upstream0 ft. MWLS - Water Level, Sag in pipe, 25 %of cross sectional area, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - DEBRIS/SAG0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish7.5 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start7.5 ft. MWLS - Water Level, Sag in pipe, 25 %of cross sectional area, Start9.8 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN16.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 24"17 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish20 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start214 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start214 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start214 ft. MGO - General Observation - 40% MAG COAT214 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start216 ft. AMH - Downstream Manhole, Survey Begins - H 0677216 ft. MWL - Water Level, 30 %of cross sectional area216 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (6)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

    206.2 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

  • Deposits Settled Compacted,  15 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    208.5 ft. - Deposits Settled Compacted, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 25 %of cross sectional area, Start

    208.5 ft. - Water Level, Sag in pipe, 25 %of cross sectional area, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    216 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (19)

DistanceCodeObservation
208.5DSC
206.2TBOPEN
0AMHH 0677
0MWL
208.5MWLS
0MWM
196SAP
2DAGS
2SAV
214DAGS
199SAP
216MWLS
216SSS
2MGO40% MAG COAT
216MSADEBRIS/SAG
199.8TFC
2SSS
216SAV
216DSC

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING, SAG
custom_field_two
5
customer
1
datetime
2021-06-03T07:39:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false