Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2021, 03:07 PM
  • H 0676_H 0674_06032021_082916.mp4

Date
06/03/2021
W/O
891214
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P11083
Time
8:07 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8978
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_891214_TV18175_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0676
Downstream MH
H 0674
Dir. of Survey
Downstream
Length Surveyed
623.6 ft.
Total Length
623.6 ft.
Structural Index
3
Structural Quick
3X2X
Structural Rating
620
O&M Index
2
O&M Quick
412X
O&M Rating
252
Overall Index
2
Overall Quick
Overall Rating
872
Pipe schematic from manhole H 0676 to H 0674
MH: H 0676MH: H 0674downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06760 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start191.4 ft. MGO - General Observation - H 0675 DOES NOT EXIST515.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4" - UNKNOWN599.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start599.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish621 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish623.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish623.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish623.6 ft. AMH - Downstream Manhole, Survey Ends - H 0674623.6 ft. MGO - General Observation - MH 0675 DOES NOT EXIST

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    599.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
191.4MGOH 0675 DOES NOT EXIST
621DAGS
0AMHH 0676
0MWM
2SAV
623.6AMHH 0674
599.4SAP
0MWL
2SSS
599.4SAV
515.6TFUNKNOWN
623.6MGOMH 0675 DOES NOT EXIST
623.5SAP
623.5SSS
2DAGS

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-06-03T08:07:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false