Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 24, 2021, 05:08 PM
  • 1_1_1_24062021_110903.mp4

Date
06/24/2021
W/O
0890797
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00334
PipeID
P08414
Time
10:08 AM
Certificate
U-1014-06022541
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0316
Sewer Name
JOINT OUTFALL A - UNIT 3C
City
COMPTON
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20210624SHO_JOINT_OUTFALL_A_UNIT_3C
Sewer Type
Gravity
Material
RCP-CTL
Shape
Circular
Height
78 in.
Width
78 in.
Upstream MH
A 0039
Downstream MH
A 0038
Dir. of Survey
Downstream
Length Surveyed
1474 ft.
Total Length
1474 ft.
Structural Index
3
Structural Quick
3n00
Structural Rating
705
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
705
Pipe schematic from manhole A 0039 to A 0038
MH: A 0039MH: A 0038downstream0 ft. AMH - Upstream Manhole, Survey Begins - MH A 390 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF15 ft. MGO - General Observation - MAG COAT ABOUT 75% INTACT83 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish191 ft. MGO - General Observation - ABANDONED MH229 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF595 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish664 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF1256 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1321 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF1421 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 24"1464 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1474 ft. AMH - Downstream Manhole, Survey Ends - MH A 38

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF

    8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF

Observations (15)

DistanceCodeObservation
191MGOABANDONED MH
229SAV10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF
15MGOMAG COAT ABOUT 75% INTACT
1474AMHMH A 38
0AMHMH A 39
83SAV
1256SAV
1321SAV10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF
1464SAV
8SAV10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF
0MWL
1421TF
595SAV
664SAV10% MISSING TILES, BOTTOM PORTION OF VISIBLE PIPE HAS AGG. ON AND OFF
0MWM

Properties (7)

additional_info
RFIR
custom_field_three
AGG. VISIBILE ON & OFF
custom_field_two
3
customer
1
datetime
2021-06-24T10:08:30-07:00
documentation
OBREGON, IGNACIO, RUVALCABA, SHADLER
is_lateral_inspection
false