Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2021, 02:32 PM
  • 15 0240_15 0239_05282021_075945.mp4

Date
05/28/2021
W/O
890822
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00627
PipeID
P12162
Time
7:32 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8970
Sewer Name
15 SAN JOSE CREEK TRUNK
City
HACIENDA HEIGHTS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
WO_890822_TV15001_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
15 0240
Downstream MH
15 0239
Dir. of Survey
Downstream
Length Surveyed
544.4 ft.
Total Length
544.4 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 15 0240 to 15 0239
MH: 15 0240MH: 15 0239downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 02400 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start208.3 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 10"235.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start235.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish249.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 10"542.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish544.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0239

Observation photos (5)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 10"

    208.3 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 10"

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    235.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 10"

    249.9 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 10"

Observations (11)

DistanceCodeObservation
0AMH15 0240
2MGOMAG COAT
542.4SAP
235.9SAP
235.9SAV
249.9TBA
0MWM
0MWL
2SAV
208.3TB
544.4AMH15 0239

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-05-28T07:32:37-07:00
documentation
PRO PIPE
is_lateral_inspection
false