Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2021, 05:11 AM
  • 18 0765_18 0764_05272021_222702.mp4

Date
05/27/2021
W/O
891160
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00706
PipeID
P14624
Time
10:11 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8929
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_891160_TV18103_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0765
Downstream MH
18 0764
Dir. of Survey
Downstream
Length Surveyed
289.8 ft.
Total Length
289.8 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
162
O&M Index
2
O&M Quick
2H00
O&M Rating
88
Overall Index
3
Overall Quick
Overall Rating
250
Pipe schematic from manhole 18 0765 to 18 0764
MH: 18 0765MH: 18 0764downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 18 07650 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. MGO - General Observation - 80% MAG COAT14.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start67.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS161 ft. MWM - Water Mark, 40 %of cross sectional area168.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN199.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"201.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"287 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish287 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish289.8 ft. MGO - General Observation - ROACHES @ MH289.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0764

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • General Observation - 80% MAG COAT

    2 ft. - General Observation - 80% MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    289.8 ft. - General Observation - ROACHES @ MH

Observations (17)

DistanceCodeObservation
0MWM
201.5TFA
14.7SAV
161MWM
199.2TFA
0MGOROACHES @ MH
67.6DSZDEBRIS
287SAV
287DSZ
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
289.8MGOROACHES @ MH
0AMH18 0765
168.7TFOPEN
0MWL
289.8AMH18 0764
2MGO80% MAG COAT
0MGOCONN @ MH 3 O'CLOCK/ACTIVE

Properties (6)

additional_info
630069052721201
custom_field_two
3
customer
1
datetime
2021-05-27T22:11:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false