Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2021, 08:43 AM
  • 18 0743_18 0742_05252021_014811.mp4

Date
05/25/2021
W/O
891160
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00706
PipeID
P14596
Time
1:43 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8878
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_891160_TV18103_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0743
Downstream MH
18 0742
Dir. of Survey
Downstream
Length Surveyed
92.6 ft.
Total Length
92.6 ft.
Structural Index
2
Structural Quick
3B2C
Structural Rating
84
O&M Index
2
O&M Quick
2C00
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
120
Pipe schematic from manhole 18 0743 to 18 0742
MH: 18 0743MH: 18 0742downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 07430 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.7 ft. MGO - General Observation - 65% MAG COAT25.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish25.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start90 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish90 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish92 ft. MGO - General Observation - ROACHES @ MH92.6 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE92.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish92.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0742

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    25.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
92.6MGOCONN @ MH 3 O'CLOCK/ACTIVE
92MGOROACHES @ MH
0AMH18 0743
10.7SAV
0MWL
25.5SAV
25.6SAP
0MWM
92.6SAP
92.6AMH18 0742
10.7MGO65% MAG COAT
2SSS
90SSS
90DAGS
2DAGS

Properties (7)

additional_info
630138052421202
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-05-25T01:43:30-07:00
documentation
PROPIPE
is_lateral_inspection
false