Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 26, 2021, 10:00 AM
  • 18 0730_18 0729_05262021_030815.mp4

Date
05/26/2021
W/O
891160
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00706
PipeID
P14583
Time
3:00 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8881
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_891160_TV18103_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0730
Downstream MH
18 0729
Dir. of Survey
Downstream
Length Surveyed
309.8 ft.
Total Length
309.8 ft.
Structural Index
3
Structural Quick
5K3K
Structural Rating
618
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
3
Overall Quick
Overall Rating
740
Pipe schematic from manhole 18 0730 to 18 0729
MH: 18 0730MH: 18 0729downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED0 ft. AMH - Upstream Manhole, Survey Begins - 18 07302 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start111.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"270.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"307 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish307 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE309.8 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0729

Observation photos (2)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
307SSS
309.8SAP
309.8MGOCONN @ MH 9 O'CLOCK/ACTIVE
307DAGS
309.8SRV
0MWM
2DAGS
270.2TFA
111.1TFA
2.1SRV
2SSS
0MWL
2.1SAP
0MGOCONN @ MH 3 O'CLOCK/CAPPED
0AMH18 0730
309.8AMH18 0729

Properties (7)

additional_info
630138052521203
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-05-26T03:00:38-07:00
documentation
PROPIPE
is_lateral_inspection
false