Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 11, 2021, 06:22 AM
  • 22 0618_22 0617_05102021_233411.mp4

Date
05/10/2021
W/O
891211
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16966
Time
11:22 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8906
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0618
Downstream MH
22 0617
Dir. of Survey
Downstream
Length Surveyed
212.3 ft.
Total Length
212.3 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
2
O&M Quick
2H00
O&M Rating
86
Overall Index
2
Overall Quick
Overall Rating
296
Pipe schematic from manhole 22 0618 to 22 0617
MH: 22 0618MH: 22 0617downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 06180 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start23.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"87.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"91 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 6", 2" - DEFECTIVE-BROKEN/OPEN135.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN184.2 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN191.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"199.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN210.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish210.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish210.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish212.3 ft. MGO - General Observation - ROACHES @ MH212.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0617

Observation photos (5)

  • General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN

    0 ft. - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    212.3 ft. - General Observation - ROACHES @ MH

Observations (24)

DistanceCodeObservation
210.1SAP
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
191.6TFC
2SAP
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
0MGOROACHES @ MH
2MGO35% MAG COAT
87.7TFC
183.7TFOPEN
0AMH22 0618
210.1SSS
0MWM
0MWL
23.6TFC
184.2TBOPEN
210.1DAGS
212.3MGOROACHES @ MH
35.2TFA
135.2TFC
199.5TFOPEN
2SSS
212.3AMH22 0617
2DAGS
91TBIDEFECTIVE-BROKEN/OPEN

Properties (7)

additional_info
630069051021201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-10T23:22:17-07:00
documentation
PRO PIPE
is_lateral_inspection
false