Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 11, 2021, 06:52 AM
  • 22 0616_22 0615A_05112021_000722.mp4

Date
05/10/2021
W/O
891211
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16964
Time
11:52 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8906
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0616
Downstream MH
22 0615A
Dir. of Survey
Downstream
Length Surveyed
290 ft.
Total Length
290 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
285
O&M Index
2
O&M Quick
2J00
O&M Rating
114
Overall Index
2
Overall Quick
Overall Rating
399
Pipe schematic from manhole 22 0616 to 22 0615A
MH: 22 0616MH: 22 0615Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06160 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT53.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"57.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"105.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN142.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"174.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"195.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN207.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"211.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"288.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish288.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish288.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish290 ft. MGO - General Observation - ROACHES @ MH290 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE290 ft. AMH - Downstream Manhole, Survey Ends - 22 0615A

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    290 ft. - General Observation - ROACHES @ MH

Observations (24)

DistanceCodeObservation
2SAP
195.4TBOPEN
142.5TFC
57.7TFC
53.2TFC
2DAGS
288.3SAP
290MGOROACHES @ MH
288.3DAGS
290MGOCONN @ MH 3 O'CLOCK/ACTIVE
0AMH22 0616
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
290AMH22 0615A
207.3TFC
0MGOROACHES @ MH
0MWM
117.6TFOPEN
105.7TFC
288.3SSS
2SSS
2MGO35% MAG COAT
174.7TFC
211.1TFC
0MWL

Properties (7)

additional_info
630069051021201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-10T23:52:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false