Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2021, 06:10 AM
  • 22 0611A_22 0611_05112021_233712.mp4

Date
05/11/2021
W/O
891211
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00827
PipeID
P16959
Time
11:10 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8850
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0611A
Downstream MH
22 0611
Dir. of Survey
Downstream
Length Surveyed
366.6 ft.
Total Length
366.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0611A to 22 0611
MH: 22 0611AMH: 22 0611downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 0611A0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 25 %of cross sectional area4.1 ft. MGO - General Observation - 55% MAG COAT4.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"48.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"52.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"101.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"105.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"150.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"154.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"198.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"202.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"251.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"255.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"300 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"304.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"349 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"353.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"364.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish366.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0611

Observation photos (3)

  • General Observation - 55% MAG COAT

    4.1 ft. - General Observation - 55% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
52.7TFC
304.4TFC
4.2SSS
4.4TFC
349TFC
150.2TFC
251.4TFC
366.6AMH22 0611
0MWM
154.1TFC
255.4TFC
198.3TFC
0AMH22 0611A
364.2SSS
48.5TFC
105.8TFC
353.7TFC
364.2SAV
4.1MGO55% MAG COAT
101.3TFC
202.8TFC
4.2SAV
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
300TFC
0MWL

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2021-05-11T23:10:51-07:00
documentation
PRO PIPE
is_lateral_inspection
false