Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2021, 07:52 AM
  • 22 0609_22 0608_05122021_011341.mp4

Date
05/12/2021
W/O
891211
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00827
PipeID
P16956
Time
12:52 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8850
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0609
Downstream MH
22 0608
Dir. of Survey
Downstream
Length Surveyed
342.7 ft.
Total Length
342.7 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
340
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
340
Pipe schematic from manhole 22 0609 to 22 0608
MH: 22 0609MH: 22 0608downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06092 ft. MGO - General Observation - 60% MAG COAT2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"51.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN86.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 8"99 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 8" - OPEN119.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN192.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8" - OPEN208.8 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 8"220.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN261.6 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"285.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN293 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN342 ft. MGO - General Observation - ROACHES @ MH342.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish342.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish342.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0608

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

    99 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"

    261.6 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"

Observations (22)

DistanceCodeObservation
13.5TFC
51.5TFOPEN
285.4TFOPEN
0MWM
342MGOROACHES @ MH
0MGOROACHES @ MH
342.7SAV
99TBOPEN
0MWL
192.1TFOPEN
220.8TFOPEN
2.4SSS
261.6TBA
342.7SSS
208.8TFA
293TFOPEN
342.7AMH22 0608
86.9TFA
2.4SAV
0AMH22 0609
2MGO60% MAG COAT
119.6TFOPEN

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
2
customer
1
datetime
2021-05-12T00:52:53-07:00
documentation
PRO PIPE
is_lateral_inspection
false