Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2021, 09:51 AM
  • 22 0623_22 0622_05072021_025608.mp4

Date
05/07/2021
W/O
891211
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16971
Time
2:51 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8903
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0622
Downstream MH
22 0623
Dir. of Survey
Upstream
Length Surveyed
26.2 ft.
Total Length
26.2 ft.
Structural Index
3
Structural Quick
3525
Structural Rating
25
O&M Index
2
O&M Quick
3125
O&M Rating
13
Overall Index
2
Overall Quick
Overall Rating
38
Pipe schematic from manhole 22 0622 to 22 0623
MH: 22 0622MH: 22 0623upstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - DUE TO DEBRIS/OBSTRUCTION.0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIS/OBSTRUCTION24.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start24.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.2 ft. MGO - General Observation - 45% MAG COAT26.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE26.2 ft. MWL - Water Level, 25 %of cross sectional area26.2 ft. AMH - Downstream Manhole, Survey Begins - 22 062226.2 ft. MGO - General Observation - ROACHES @ MH26.2 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES - DEBRIS/OBSTRUCTION

    26.2 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIS/OBSTRUCTION

Observations (14)

DistanceCodeObservation
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
0AMH22 0622
2DAGS
2SAP
26.2SSS
26.2SAP
26.2MSADUE TO DEBRIS/OBSTRUCTION.
0MGOROACHES @ MH
2SSS
2MGO45% MAG COAT
26.2DAGS
0MWM
26.2DSZDEBRIS/OBSTRUCTION

Properties (7)

additional_info
630069050621201
custom_field_three
DUE TO DEBRIS/OBSTRUCTION
custom_field_two
5
customer
1
datetime
2021-05-07T02:51:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false