Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2021, 09:44 AM
  • 22 0622_22 0621_05072021_025053.mp4

Date
05/07/2021
W/O
891211
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16970
Time
2:44 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8903
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0621
Downstream MH
22 0622
Dir. of Survey
Upstream
Length Surveyed
130.8 ft.
Total Length
130.8 ft.
Structural Index
2
Structural Quick
322D
Structural Rating
56
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
106
Pipe schematic from manhole 22 0621 to 22 0622
MH: 22 0621MH: 22 0622upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 06220 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MGO - General Observation - ROACHES @ MH2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish5.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"9.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"57.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"102.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"117.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start128.8 ft. MGO - General Observation - 65% MAG COAT128.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start128.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start130.8 ft. MWL - Water Level, 30 %of cross sectional area130.8 ft. AMH - Downstream Manhole, Survey Begins - 22 0621130.8 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    130.8 ft. - General Observation - ROACHES @ MH

Observations (19)

DistanceCodeObservation
130.8AMH22 0622
56.1TFC
0MWL
2SSS
2MGO65% MAG COAT
28.4TFC
73.1TFC
128.5SSS
130.8MGOCONN @ MH 3 O'CLOCK/ACTIVE
0AMH22 0621
2SAV
2DAGS
0MWM
128.5DAGS
13.1TFC
128.5SAV
130.8MGOROACHES @ MH
125.6TFC
121.7TFC

Properties (7)

additional_info
630069050621201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-05-07T02:44:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false