Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2021, 04:49 AM
  • 22 0686_22 0685A_05122021_215836.mp4

Date
05/12/2021
W/O
891211
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00827
PipeID
P21326
Time
9:49 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8951
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
15
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0686
Downstream MH
22 0685A
Dir. of Survey
Downstream
Length Surveyed
71.4 ft.
Total Length
71.4 ft.
Structural Index
2
Structural Quick
2B00
Structural Rating
28
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
28
Pipe schematic from manhole 22 0686 to 22 0685A
MH: 22 0686MH: 22 0685Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06860 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. MGO - General Observation - 35% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8" - OPEN14.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 8"65.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 8"69.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish69.8 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN71.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0685A71.4 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (2)

  • General Observation - 35% MAG COAT

    2 ft. - General Observation - 35% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0AMH22 0686
71.4AMH22 0685A
2MGO35% MAG COAT
9.1TFOPEN
0MWM
65.3TFC
2SSS
69.8SSS
0MWL
71.4MGOCONN @ MH 9 O'CLOCK/ACTIVE
69.8MGOCONN @ MH 3 O'CLOCK/OPEN
0MGOROACHES @ MH
14.2TFA

Properties (6)

custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-05-12T21:49:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false