Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2021, 11:00 AM
  • 22 0665_22 0664_05122021_041352.mp4

Date
05/12/2021
W/O
891211
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00827
PipeID
P17014
Time
4:00 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8850
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0664
Downstream MH
22 0665
Dir. of Survey
Upstream
Length Surveyed
304 ft.
Total Length
304 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
2
Overall Quick
Overall Rating
420
Pipe schematic from manhole 22 0664 to 22 0665
MH: 22 0664MH: 22 0665upstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 22 06653 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish24.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"29.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"89.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN94.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"191.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"196.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"242.2 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 8"301.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start301.8 ft. MGO - General Observation - 65% MAG COAT301.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start302 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start304 ft. MWL - Water Level, 15 %of cross sectional area304 ft. MWM - Water Mark, 20 %of cross sectional area304 ft. AMH - Downstream Manhole, Survey Begins - 22 0664304 ft. MGO - General Observation - CONN @ MH 9 OCLOCK/CAPPED

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 65% MAG COAT

    2.2 ft. - General Observation - 65% MAG COAT

Observations (19)

DistanceCodeObservation
61.8TFA
304SSS
274.7TFC
0MWL
0MWM
304SAV
2DAGS
2.1SAV
301DAGS
112.6TFC
2.2SSS
2.2MGO65% MAG COAT
209.4TFC
279.8TFC
0AMH22 0664
304AMH22 0665
0MGOCONN @ MH 9 OCLOCK/CAPPED
214.4TFOPEN
107.5TFC

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2021-05-12T04:00:29-07:00
documentation
PRO PIPE
is_lateral_inspection
false