Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2021, 09:48 AM
  • 22 0656_22 0655_05122021_033950.mp4

Date
05/12/2021
W/O
891211
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00827
PipeID
P17004
Time
2:48 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8850
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0656
Downstream MH
22 0655
Dir. of Survey
Downstream
Length Surveyed
300.2 ft.
Total Length
300.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
300
Pipe schematic from manhole 22 0656 to 22 0655
MH: 22 0656MH: 22 0655downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06562 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"72.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"76.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN166.9 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN187 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN239.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 8"244.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN299.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300 ft. MGO - General Observation - ROACHES @ MH300.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0655

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

    166.9 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

Observations (17)

DistanceCodeObservation
2.1SAV
239.8TFC
0MGOROACHES @ MH
72.5TFC
187TFOPEN
76.9TFOPEN
0MWL
299.9SSS
0MWM
299.9SAV
244.1TFOPEN
300.2AMH22 0655
0AMH22 0656
300MGOROACHES @ MH
19.1TFC
2SSS
166.9TBOPEN

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2021-05-12T02:48:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false