Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 29, 2021, 06:02 AM
  • 22 0651_22 0650_04282021_231503.mp4

Date
04/28/2021
W/O
891211
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16999
Time
11:02 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8793
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0651
Downstream MH
22 0650
Dir. of Survey
Downstream
Length Surveyed
319.4 ft.
Total Length
319.4 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
315
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
441
Pipe schematic from manhole 22 0651 to 22 0650
MH: 22 0651MH: 22 0650downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06510 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start12.4 ft. MGO - General Observation - 55% MAG COAT104.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN181.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"302.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"306.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish317.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish319.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0650319.4 ft. MGO - General Observation - ROACHES @ MH

Observation photos (6)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 55% MAG COAT

    12.4 ft. - General Observation - 55% MAG COAT

  • General Observation - ROACHES @ MH

    319.4 ft. - General Observation - ROACHES @ MH

Observations (19)

DistanceCodeObservation
181.2TFC
4.6SSS
306.5TFC
2SAV
2DAGS
0AMH22 0651
317.5SSS
0MGOROACHES @ MH
317.5SAV
319.4AMH22 0650
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
319.4MGOROACHES @ MH
176.9TFOPEN
317.5DAGS
0MWL
104.1TFC
12.4MGO55% MAG COAT
302.5TFC
0MWM

Properties (7)

additional_info
630069042821201
custom_field_three
SPALLING/ AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-04-28T23:02:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false