Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 30, 2021, 05:30 AM
  • 22 0645_22 0644_04292021_224155.mp4

Date
04/29/2021
W/O
891211
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16993
Time
10:30 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8795
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_891211_TV22166_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0645
Downstream MH
22 0644
Dir. of Survey
Downstream
Length Surveyed
337.6 ft.
Total Length
337.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
469
Pipe schematic from manhole 22 0645 to 22 0644
MH: 22 0645MH: 22 0644downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06452 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start40.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"45.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"81.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"118.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"179.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"301.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"305.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"335.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish335.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.6 ft. MGO - General Observation - ROACHES @ MH337.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0644

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    337.6 ft. - General Observation - ROACHES @ MH

Observations (21)

DistanceCodeObservation
179.7TFC
45.1TFC
2SSS
337.6MGOROACHES @ MH
335.6DAGS
337.6AMH22 0644
2MGO45% MAG COAT
81.7TFC
305.1TFC
2SAP
0MGOROACHES @ MH
118.6TFC
335.6SAP
301.2TFC
40.7TFC
0MWM
175.3TFC
0MWL
2DAGS
0AMH22 0645
335.6SSS

Properties (7)

additional_info
630069042921201
custom_field_three
SPALLING/ AGGREGATE
custom_field_two
3
customer
1
datetime
2021-04-29T22:30:37-07:00
documentation
PRO PIPE
is_lateral_inspection
false