Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2021, 06:36 AM
  • 18 0440_18 0439A_05202021_234710.mp4

Date
05/20/2021
W/O
891049
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00675
PipeID
P14291
Time
11:36 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8874
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_891049_TV18097_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0439A
Downstream MH
18 0440
Dir. of Survey
Upstream
Length Surveyed
204.3 ft.
Total Length
204.3 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
200
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
200
Pipe schematic from manhole 18 0439A to 18 0440
MH: 18 0439AMH: 18 0440upstream0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 18 04400.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish7.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"25.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"28.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"77.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"125.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"154.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"178.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"200.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"202.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start202.2 ft. MGO - General Observation - HEAVY STEAM202.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start204.3 ft. MWL - Water Level, 15 %of cross sectional area204.3 ft. MWM - Water Mark, 15 %of cross sectional area204.3 ft. AMH - Downstream Manhole, Survey Begins - 18 0439A204.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
196.9TFC
102.8TF
152.5TFC
2.1SAV
0MWL
2SSS
179.2TF
204.3SAV
2.1MGOHEAVY STEAM
78.8TFC
0MWM
0AMH18 0439A
76.6TF
49.7TFC
3.4TFC
204.3AMH18 0440
25.9TFC
175.8TFC
204SSS
0MGOCONNECTION AT MH 9 O'CLOCK
126.5TFC

Properties (7)

additional_info
630138052021201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-05-20T23:36:44-07:00
documentation
PROPIPE
is_lateral_inspection
false