Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2021, 05:55 AM
  • 02 1209_02 1434_06072021_230011.mp4

Date
06/07/2021
W/O
890820
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00349
PipeID
P03006
Time
10:55 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8886
Sewer Name
02 DISTRICT #2 INTERCEPTOR TRUNK
City
COMMERCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
WO_890820_TV02317_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
33 in.
Upstream MH
02 1209
Downstream MH
02 1434
Dir. of Survey
Downstream
Length Surveyed
48.4 ft.
Total Length
48.4 ft.
Structural Index
2
Structural Quick
3127
Structural Rating
17
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
17
Pipe schematic from manhole 02 1209 to 02 1434
MH: 02 1209MH: 02 1434downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 12090 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 25 %of cross sectional area8.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES11.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start48.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish48.4 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK48.4 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK48.4 ft. AMH - Downstream Manhole, Survey Ends - 02 1434

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    8.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
48.4SSS
0AMH02 1209
0MGOCONNECTION AT THE MH 3 OC'LOCK
0MWL
48.4MGOCONNECTION AT THE MH 9 OC'LOCK
8.1SAP
11.3SSS
0MGOCONNECTION AT THE MH 9 OC'LOCK
0MWM
48.4MGOCONNECTION AT THE MH 3 OC'LOCK
48.4AMH02 1434

Properties (7)

additional_info
630074060721201
custom_field_three
SPALLING/AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-06-07T22:55:46-07:00
documentation
PROPIPE
is_lateral_inspection
false