Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2021, 07:58 AM
  • 02 1414_02 1413_06102021_011532.mp4

Date
06/10/2021
W/O
890820
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00349
PipeID
P02985
Time
12:58 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8893
Sewer Name
02 DISTRICT #2 INTERCEPTOR TRUNK
City
COMMERCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
20
Purpose
Routine Assessment
Project
WO_890820_TV02317_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
33 in.
Upstream MH
02 1414
Downstream MH
02 1413
Dir. of Survey
Downstream
Length Surveyed
649.5 ft.
Total Length
649.5 ft.
Structural Index
3
Structural Quick
3Y00
Structural Rating
384
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
384
Pipe schematic from manhole 02 1414 to 02 1413
MH: 02 1414MH: 02 1413downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 14140 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT3.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start645.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish649.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1413

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
2.1MGOMAG COAT
0AMH02 1414
649.5AMH02 1413
0MWL
0MGOCONNECTION AT THE MH 9 OC'LOCK
645.4SAV
0MWM
3.1SAV

Properties (7)

additional_info
630074060921203
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-06-10T00:58:11-07:00
documentation
PROPIPE
is_lateral_inspection
false