Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2021, 06:44 AM
  • 01 0950_01 0949_05202021_235603.mp4

Date
05/20/2021
W/O
890942
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00228
PipeID
P01787
Time
11:44 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8965
Sewer Name
01 WRIGHT ROAD TRUNK
City
BELL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_890942_TV01251_MAY2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
36 in.
Upstream MH
01 0950
Downstream MH
01 0949
Dir. of Survey
Downstream
Length Surveyed
290.1 ft.
Total Length
290.1 ft.
Structural Index
3
Structural Quick
3J28
Structural Rating
184
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
188
Pipe schematic from manhole 01 0950 to 01 0949
MH: 01 0950MH: 01 0949downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 09500 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area7.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start169.8 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start208.2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish289.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.1 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK290.1 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK290.1 ft. AMH - Downstream Manhole, Survey Ends - 01 0949

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    169.8 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

Observations (10)

DistanceCodeObservation
0AMH01 0950
7.3CM
290.1MGOCONNECTION AT THE MH 9 OC'LOCK
0MWM
208.2MWLS
169.8MWLS
289.1CM
290.1MGOCONNECTION AT THE MH 3 OC'LOCK
290.1AMH01 0949
0MWL

Properties (7)

custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2021-05-20T23:44:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
10286