Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2021, 08:41 AM
  • 01 0946_01 0945_05212021_015311.mp4

Date
05/21/2021
W/O
890942
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00228
PipeID
P01783
Time
1:41 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8965
Sewer Name
01 WRIGHT ROAD TRUNK
City
BELL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_890942_TV01251_MAY2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
36 in.
Upstream MH
01 0946
Downstream MH
01 0945
Dir. of Survey
Downstream
Length Surveyed
293.4 ft.
Total Length
293.4 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
174
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
174
Pipe schematic from manhole 01 0946 to 01 0945
MH: 01 0946MH: 01 0945downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 09460 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK5.8 ft. CM - Crack Multiple, from 12 to 05 o'clock, within 8 inches of joint: YES10.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start293.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish293.4 ft. AMH - Downstream Manhole, Survey Ends - 01 0945

Observation photos (2)

  • Crack Multiple, from 12 to 05 o'clock, within 8 inches of joint: YES

    5.8 ft. - Crack Multiple, from 12 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MWM
0AMH01 0946
5.8CM
0MGOCONNECTION AT THE MH 9 OC'LOCK
293.4CM
293.4AMH01 0945
0MWL
10.7CM
0MGOCONNECTION AT THE MH 3 OC'LOCK

Properties (7)

custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2021-05-21T01:41:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
10286