Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2021, 10:54 AM
  • 15 1163_15 1162_6142021_040709.mp4

Date
06/14/2021
W/O
0891152
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00635
PipeID
P25909
Time
3:54 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1845
Sewer Name
15 TYLER AVENUE RELIEF TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Capital Improvement Program Assesment
Project
20210614MDM_TYLER_AVENUE_RELIEF_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
15 1163
Downstream MH
15 1162
Dir. of Survey
Downstream
Length Surveyed
254.9 ft.
Total Length
254.9 ft.
Structural Index
2
Structural Quick
2400
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 15 1163 to 15 1162
MH: 15 1163MH: 15 1162downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 4:05AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHTLY PEELING & BLISTERING OUTER LAYER18 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - SLIGHT PEELING & BLISTERING OUTER LAYER30.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER35 ft. MGP - General Photograph99.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open113 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open136.5 ft. SSS - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER220.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open254.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SLIGHT PEELING & BLISTERING OUTER LAYER254.9 ft. AMH - Downstream Manhole, Survey Ends - 4:30AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHTLY PEELING & BLISTERING OUTER LAYER

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHTLY PEELING & BLISTERING OUTER LAYER

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - SLIGHT PEELING & BLISTERING OUTER LAYER

    18 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - SLIGHT PEELING & BLISTERING OUTER LAYER

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER

    30.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER

  • General Photograph

    35 ft. - General Photograph

  • Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER

    136.5 ft. - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER

Observations (14)

DistanceCodeObservation
0MWL
99.1TFOpen
113TFOpen
0MGOConn. @ Mh, 9 O' Clock. Active
254.4SSSSLIGHT PEELING & BLISTERING OUTER LAYER
18SSSSLIGHT PEELING & BLISTERING OUTER LAYER
2SSSSLIGHTLY PEELING & BLISTERING OUTER LAYER
220.3TFOpen
0AMH4:05AM
0MWM
254.9AMH4:30AM
35MGP
30.7SSSPEELING OUTER LAYER
136.5SSSPEELING OUTER LAYER

Properties (6)

custom_field_three
SLIGHT PEELING & BLISTERING OUTER LAYER
custom_field_two
3
customer
LACSD
datetime
2021-06-14T03:54:14-07:00
documentation
MARTIN,OLIVER 111,RAMIREZ
is_lateral_inspection
false