Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2021, 08:30 AM
  • 15 1166_15 1165_6142021_013311.mp4

Date
06/14/2021
W/O
0891152
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00635
PipeID
P25912
Time
1:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1845
Sewer Name
15 TYLER AVENUE RELIEF TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Capital Improvement Program Assesment
Project
20210614MDM_TYLER_AVENUE_RELIEF_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
15 1166
Downstream MH
15 1165
Dir. of Survey
Downstream
Length Surveyed
309.8 ft.
Total Length
309.8 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 15 1166 to 15 1165
MH: 15 1166MH: 15 1165downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:30AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT PEELING & BLISTERING OUTER LAYER42 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6", 6" - Open101.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER108.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open166.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER EXPOSING VCP FIBERS179.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active259.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open309.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING & BLISTERING OUTER LAYER309.8 ft. AMH - Downstream Manhole, Survey Ends - 2:00AM

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT PEELING & BLISTERING OUTER LAYER

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT PEELING & BLISTERING OUTER LAYER

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER

    101.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER EXPOSING VCP FIBERS

    166.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER LAYER EXPOSING VCP FIBERS

Observations (13)

DistanceCodeObservation
179.8TFAActive
309.8AMH2:00AM
108.1TFOpen
166.6SSSPEELING OUTER LAYER EXPOSING VCP FIBERS
0MGOConn. @ Mh, 9 O' Clock. Active
309.2SSSPEELING & BLISTERING OUTER LAYER
0MWL
2SSSSLIGHT PEELING & BLISTERING OUTER LAYER
0AMH1:30AM
0MWM
42TFOpen
259.2TFOpen
101.8SSSPEELING OUTER LAYER

Properties (6)

custom_field_three
SLIGHT PEELING & BLISTERING OUTER LAYER
custom_field_two
3
customer
LACSD
datetime
2021-06-14T01:30:00-07:00
documentation
MARTIN,OLIVER 111,RAMIREZ
is_lateral_inspection
false